Custom Estate Project Journal

Are the Rains Over?

There’s been quite a lot of rain recently, causing work to move inside when necessary. But at the end of the week, the weather finally cleared!

Tile and marble installations continue.

Work has resumed outside with concrete poured at the Entry Court Wall. Utility trenching and irrigation ditches were started.

 