Identifying Risks and Exposures on Construction Projects

Risks management and contingencies

Man standing on crane

Construction can be precarious. Budget-busting design omissions, unforeseen conditions and everything in between can affect a project’s bottom line; for this reason, construction project risk management is one of the most vital functions of cost estimation. 

Risk management practices in construction project management aim to prevent or reduce exposure to threats while mitigating the effects of various hazards. Common risk factors on construction projects include: 

  1. Feasibility. The decision to go ahead with a project hinges on the notion of a financially viable outcome. If such a decision is based on erroneous information, the project will likely end up being more expensive than predicted. 
  2. Design.  Construction design is a sophisticated process where multiple disciplines must interface seamlessly to ensure the project’s success. Unfortunately, even peer reviews cannot always avert human error and overlooked design omissions and lack of coordination may cause the project budget to increase.
  3. Funds. Construction projects large and small rely on a steady stream of funds to cover expenditures. If the cash flow stream is slow or abruptly halts, the project may face debilitating schedule delays, souring relationships between stakeholders, litigation, and ultimately a blow to the bottom line.
  4. Commercial viability. Construction schedule delays happen for a wide array of reasons, but inevitably, all have some degree of impact on the project’s cost. 
  5. Inaccurate quantity takeoffs. During the bidding stage, erroneous quantity surveying can cause severe repercussions. Depending on the type of contract, the contractor or owner may be liable for cost-overruns. 
  6. Subcontractors not honoring their price commitments. During estimating, a general contractor relies on subcontractors’ bids to forecast costs for various construction activities. For economic reasons, subcontractors and manufacturers may not be able to honor the prices they’ve stated in their bids to the general contractor. 
  7. Chosen methods and materials cannot be used during construction. The choice of construction methods and materials inevitably forms the basis of a project’s budget. If the selected materials are unavailable, or the methods are deemed unsuitable once construction gets underway, delays, cost overruns, and change orders may begin to plague the project. 
  8. Unexpected conditions emerging during construction. This is a significant hazard on renovation projects, as faulty conditions in existing buildings may be difficult to pinpoint without costly, invasive investigations. Renovation estimates often contain sizeable contingencies to cover unforeseen expenses. The same is true for underground conditions on new construction projects.
  9. Injuries and deaths. Due to the harsh nature of construction activities, construction is one of the most dangerous industries in the country. The Bureau of Labor Statistics estimates that every year, 150,000 accidents occur on construction sites across the country. Even with Workers’ Compensation Insurance, injuries and fatalities can lead to delays, costly lawsuits, and incur additional expenses. 
  10. Inclement weather. Excessive rain or snow, as well as intense heat and cold, can affect various construction materials and machinery, thus disrupting operations and delaying the project. Certain activities are particularly reliant on favorable weather conditions; for example, concrete placement is unadvisable in extremely low temperatures, while scaffolding and steelwork operations may be affected by electrical storms and high winds. 
  11. Damage to property. Theft of materials, vandalism, and fires can have wide-ranging consequences for construction projects. Stolen materials and equipment may lead to additional expenses, while fires may cause drastic schedule delays.



Anticipating these dangers, quantifying their dollar value, and planning adequate controls are key steps in construction estimating, as they help keep a project on time and budget.

The British Airways Authority’s (BAA) Terminal 5 project is a fitting construction project risk management case study example. The study shows how thorough hazard identification and well-planned control measures can save time and money during construction. 

The project faced several challenges, such as installing a 150-meter roof and working with limited site access. Given the scale of the project, potential cost-overruns and scheduling issues could delay the start of operations and deal a blow to the owner’s finances.  

From the start, the project team adopted an approach where project management was considered a risk management tool, and not vice versa. To this end, each liability and its cause were identified, and fitting control measures were implemented into each team member’s action plan. The risk management team set ambitious objectives for its control measures: 

  1. Keep exposure to an acceptable level with the possibility of improvement, or
  2. Reach an optimal solution for each hazard, such that no improvement is needed

In the end, the team’s approach shaved 3 months of the construction schedule, thus making up for unavoidable delays caused by inclement weather.  

If you are located in the Los Angeles or Santa Barabara Areas, contact us for more information on how we can help you with your risk management needs!

Share this: Share on Facebook Share on Linked In Share on Google Plus Share on Twitter
What is Construction Management?
What is Construction Management?

Professional construction project management is a super fine-tuned system designed to facilitate planning, coordination and control of a project from the early stages all the way to project closeout and completion. Qualified construction managers use specialized project [...]

read more
Construction Services You May Need When Building a Luxury Home in California
Construction Services You May Need When Building a Luxury Home in California

If you are building a luxury home in California, you may be wondering which construction services are of value, and which present an unnecessary expense. In our article below, we’ll offer you a concise summary of [...]

read more
Search
Popular Blog Posts
Categories
Connect With Us