2nd Update - Pacific Palisades Contemporary Estate

Structural Concrete Work

Construction of the second floor structural concrete deck is proceeding.  Reinforcing steel (rebar) is in place for the large structural concrete beams that hold up the central atrium.  All of the plywood form work will shortly be covered in rebar to prepare for a very large concrete pour of about 450 cubic yards, which the contractor hopes to do in one fell swoop.  This is 50+ trucks of concrete!  Traffic control is a big part of the story.  They will probably use two to four concrete pumps working simultaneously.  It should be an interesting all day concrete pour!

Share this: Share on Facebook Share on Linked In Share on Google Plus Share on Twitter
Reflection: Stonemark's Montecito Estate
Reflection: Stonemark's Montecito Estate

This gorgeous Montecito classical estate has been perfectly sited to take advantage of the views of the Santa Barbara foothills. The landscaping blends seamlessly with the natural oaks and scrub.  These homeowners have truly succeeded in creating [...]

read more
Final Update: Montecito Estate Project Journal
Final Update: Montecito Estate Project Journal

The homeowners have taken up residence and the home is elegantly appointed.  The kitchen is beautiful. It has been a pleasure working with renowned Appleton Architects.  See the completed home.

read more
Top Blog Posts
Categories
Connect With Us